<< First < Prev Index Next > Last >>
September 20, 2017
Almost done. The baseboards are done, with some seam filling and touch-up. Then I installed the mirror, toilet, magazine rack, robe hooks, and heater, and replaced the doorknobs and hinges. I still need to caulk the shower and sink, but it's starting to look like a real bathroom.