<< First     < Prev     Index     Next >     Last >>

September 20, 2017

Almost done. The baseboards are done, with some seam filling and touch-up. Then I installed the mirror, toilet, magazine rack, robe hooks, and heater, and replaced the doorknobs and hinges. I still need to caulk the shower and sink, but it's starting to look like a real bathroom.

<< First     < Prev     Index     Next >     Last >>